Case study

Hexagon Steam Boiler Replacement

Blakeley, Manchester

Project: Combined M&E
Contract: Design & Build
Sector: Plantrooms & Chiller Replacements
Client: AG Hexagon
Main contractor: Direct
Contract value: £800K
Duration: 18 Weeks
Completed: 2018
See more below

We were contracted to undertake the design and build of replacement steam boilers at the Hexagon Tower building in Manchester.

This work involved us partnering with Byworth Boilers to supply and instal two 12,000kg boilers to power the entire site.

A temporary boiler plant was utilised on the project to keep the building up to temperature during the construction period.