Case study

CWP Cars Ward & Lime Walk

Macclesfield, Cheshire

Project: Combined M&E – Cars Ward & Lime Walk LDU
Contract: Design & Build
Sector: Healthcare
Client: Cheshire & Wirral NHS Foundation Trust
Main contractor: Seddon
Contract value: £1.8M
Duration: 32 weeks
Completed: 2019
See more below

We were appointed to carry out the design & build on this high secure mental health refurbishment for Cheshire & Wirral NHS Foundation Trust.

Works included some sophisticated nurse call / staff attack systems, complex lighting and full anti ligature design and install.

Grilles needed to be anti-ligature along with radiator casings and the project involves mains upgrades and full boiler room replacements along with the 2 x 24 bed ward refurbishments.

A project delivered on time and on budget.