Case study

Jaguar Landrover
LEV

Halewood, Liverpool

Project: Combined M&E – LEV Fan Upgrade
Contract: Traditional
Sector: Industrial
Client: Jaguar Landrover
Main contractor: Direct
Contract value: £850K
Duration: 20 Weeks
Completed: 2025
See more below

We were contracted at short notice to design and instal 28 local exhaust ventilation systems to the Jaguar Landrover plant in Halewood, Liverpool. These systems systems are designed to reduce employee exposure to airborne contaminants (dust, mist, fume, vapour, gas) in the workplace by capturing the emission at source and transporting it to a safe emission point or to a filter/scrubber.

The work icluded:

  • Fans
  • Duct work
  • Machine connections
  • Electrical supplies

All case studies