Case study

Avalanche Studios

Central Liverpool

Project: Combined M&E – CAT B Fit Out
Contract: Design & Build
Sector: Commercial Office
Client: Avalanche Studios Group
Main contractor: Overbury
Contract value: £700K
Duration: 20 Weeks
Completed: 2022
See more below

Avalanche Studios are part of the Universal Pictures Group and create innovative, world-class gamin experiences.

Avalanche occupied the 8th floor of St Paul’s Square in Liverpool city centre.

CP Hood were contracted to carry out the category B Design & Build of mechanical and electrical services across a 16 week programme.

All works were designed in keeping with BB93 and involved very complex acoustic and audio visual systems.

Works included:

  • Lighting
  • Power
  • HVAC systems to compliment to aspired layout
  • Server room designed to N+2 (high-level, fault-tolerant infrastructure design) to add resilience to their server cabinets

 